International Journal of Mechanical Engineering and Research

Online Journal

  • Increase font size
  • Default font size
  • Decrease font size

Performance analysis of Boiler by Flash Steam Recovery: A Case Study

Research Area: Volume 5 Issue 1 Year: 2016
Type of Publication: Article Keywords: Energy, Efficiency, Flash Steam Vessel, Coal fired water tube boiler, Boiler, HP and LP heater, CEP
  • Surendra Kumar Bharti
  • Ravi Vishwakarma
  • Narayan Das Pal
Journal: IJMER Volume: 5
Number: 1 Pages: 1-6
Month: Jan-June
ISSN: 2277-8128
Analysis of the thermal performance in terms of efficiency of briquette boiler has been carried out Lupin pharmaceutical Mandideep Raisen (MP), India. While working under two entirely different working condition, namely the one, where flash steam wastage employed and the second where this process replaced by the installation of flash vessel recovery system. The present study predicts and overall advantage, the second alternative has over the traditional/conventional method of wastage of low pressure flash steam. The proposed replacement results in the improvement of overall thermal efficiency and annual maintenance cost also is reduced considerably due to greater increased running period of briquette boiler.
Full text: 5101.pdf

Login Form

mod_vvisit_counterThis week67
mod_vvisit_counterLast week394
mod_vvisit_counterThis month780
mod_vvisit_counterLast month839
mod_vvisit_counterAll days753466